Document Details
Finishing the All-American Canal
| September 1st, 2020
Work on the All-American Canal is going forward so rapidly that the great 80-mile ditch and its appurtenant features will be ready to deliver irrigation water to the Imperial Valley in southeastern California some time during the first half of 1938. The waterway is being dug across a normally desert region that once formed the water bed of the prehistoric northern extension of the Gulf of California, as we know it today. Paradoxically, that far flung section of the Gulf was transform ed into a generally barren and arid region by the very river that is to be tapped to assure the continued agricultural productivity · of soil that can be made amazingly fruitful by irrigation.
Keywords