Eastern San Joaquin Groundwater Subbasin Groundwater Sustainability Plan (Revised)
Eastern San Joaquin Groundwater Authority | June 15th, 2022
In 2014, the California legislature enacted the Sustainable Groundwater Management Act (SGMA) in response to continued overdraft of California’s groundwater resources. The Eastern San Joaquin Groundwater Subbasin (Eastern San Joaquin Subbasin, or Subbasin) is one of 21 basins and subbasins identified by the California Department of Water Resources (DWR) as being in a state of critical overdraft. SGMA requires preparation of a Groundwater Sustainability Plan (GSP) to address measures necessary to attain sustainable conditions in the Subbasin. Within the framework of SGMA, sustainability is generally defined as long-term reliability of the groundwater supply and the absence of undesirable results.
The Eastern San Joaquin Groundwater Authority (ESJGWA) was formed in 2017 in response to SGMA. A Joint Exercise of Powers Agreement establishes the ESJGWA, which is composed of 16 Groundwater Sustainability Agencies (GSAs): Central Delta Water Agency (CDWA), Central San Joaquin Water Conservation District (CSJWCD), City of Lodi, City of Manteca, City of Stockton, Eastside San Joaquin GSA (Eastside GSA) (composed of Calaveras County Water District [CCWD], Stanislaus County, and Rock Creek Water District), Linden County Water District (LCWD), Lockeford Community Services District (LCSD), North San Joaquin Water Conservation District (NSJWCD), Oakdale Irrigation District (OID), San Joaquin County No. 1, San Joaquin County No. 2 (with participation from California Water Service Company Stockton District [Cal Water]), South Delta Water Agency (SDWA), South San Joaquin GSA (composed of South San Joaquin Irrigation District [SSJID] including Woodward Reservoir, City of Ripon, and City of Escalon), Stockton East Water District (SEWD), and Woodbridge Irrigation District (WID). The ESJGWA is governed by a 16-member Board of Directors (ESJGWA Board), with one representative from each GSA. The Board is guided by an Advisory Committee, also with one representative from each GSA, that is tasked with making recommendations to the ESJGWA Board on technical and substantive matters.
SGMA requires development of a GSP that achieves groundwater sustainability in the Subbasin by 2040. The GSP outlines the need to reduce overdraft conditions and has identified 23 projects for potential development that either replace groundwater use (offset) or supplement groundwater supplies (recharge) to meet current and future water demands. Although current analysis indicates that groundwater pumping offsets and/or recharge on the order of 37,000 acre-feet per year (AF/year) may be required to achieve sustainability, additional efforts are needed to confirm the level of pumping offsets and/or recharge required to achieve sustainability. These efforts include collecting additional data and a review of the Subbasin groundwater model, along with other efforts as outlined in the GSP. A Public Draft GSP was prepared and made available for public review and comment on July 10, 2019 for a period of 45 days ending on August 25, 2019. The ESJGWA received numerous comments from the public, reviewed and prepared responses to comments, and revised the Draft GSP. This Final GSP includes those edits and revisions. Comment letters and responses are included as appendices to the GSP.
On November 18, 2021, the ESJGWA received a Consultation Initiation Letter (Letter) from DWR. The Letter identified two potential deficiencies in the Subbasin GSPs which may preclude DWR’s approval, as well as potential corrective actions to address each potential deficiency. The Letter initiated consultation between DWR, the Plan Manager, the ESJGWA, and the Subbasin’s GSAs. In response to DWR’s comments, this GSP was revised in June 2022. DWR comments have also been addressed in a series of four technical memoranda appended to this revised GSP and referenced throughout the document.
Due to size, this file has been divided into eight parts. Part 1, Part 2, Part 3, Part 4, Part 5, Part 6, Part 7, Part 8