Document Details

East Contra Costa Subbasin Groundwater Sustainability Plan

Luhdorff & Scalmanini Consulting Engineers (Luhdorff & Scalmanini) | October 15th, 2021


On March 28, 2019, the state approved a subdivision of the Tracy Subbasin that separated the East Contra Costa portion (now called the ECC Subbasin) from the San Joaquin County portion (retained the Tracy Subbasin name), thereby providing more local control of groundwater resources. In addition, seven GSAs were formed by local public agencies to ensure that their diverse constituents are represented in this GSP. If needed, each GSA has authorities to enact policies to protect groundwater resources based on conditions within their respective jurisdictions. This provides stakeholders with more focused engagement through a local GSA.

Due to size, the file has been divided into six parts.

Part 1, Part 2, Part 3, Part 4, Part 5, Part 6

Keywords

Groundwater Exchange, Groundwater Sustainability Plan (GSP), Sustainable Groundwater Management Act (SGMA)