Document Details

Groundwater Sustainability Plan for the San Joaquin River Exchange Contractors GSP Group in the Delta-Mendota Subbasin (5-022.07)

San Joaquin River Exchange Contractors Water Authority (SJRECWA) | June 30th, 2022


The GSP was adopted by the SJREC GSA on December 13, 2019. The GSP has been amended in response to the January 21, 2022 DWR Determination letter to Delta-Mendota Subbasin’s Point of Contact that included evaluation of the San Joaquin River GSA’s Groundwater Sustainability Plan (GSP). The amended plan was adopted by the SJRECGSA Board on July 5, 2022. On March 2nd, 2023, the Department of Water Resources announced decisions for Groundwater Sustainability Plans (GSPs), finding that numerous subbasins were found to be inadequate. One of these subbasins—the Delta-Mendota Subbasin in San Joaquin, Stanislaus, Merced, Fresno, Madera, and San Benito counties—includes a region for which the Exchange Contractors are responsible for developing the GSP.

Due to size, this file has been divided. Part 1, Part 2, Part 3, Part 4, Part 5, Part 6, Part 7, Part 8

Keywords

Central Valley, Groundwater Exchange, Groundwater Sustainability Plan (GSP), Sustainable Groundwater Management Act (SGMA), water supply