Tule Subbasin Probationary Hearing Draft Staff Report
California State Water Resources Control Board (SWRCB) | March 1st, 2024
The State Water Board recognizes that local public agencies in the Tule Subbasin significant efforts since the passage of SGMA to form groundwater sustainability agencies (GSAs) and then develop detailed technical and other information supporting the adoption and implementation of six groundwater sustainability plans (GSPs) for the subbasin. Despite those efforts, in January of 2022, DWR reviewed GSPs to determine if the GSPs met SGMA’s requirements and found it to be incomplete. Following revisions made by the GSAs in the subbasin, DWR reevaluated the GSPs in March of 2023, determined the GSPs to be inadequate, and referred the subbasin to the State Water Board, as required by SGMA. Consistent with SGMA, the State Water Board may now consider whether to designate the Tule Subbasin as a “probationary basin,” a term that is used in SGMA to describe a basin in the first stage of state intervention.
Keywords
Central Valley, Central Valley Project (CVP), Groundwater Exchange, infrastructure, subsidence, Sustainable Groundwater Management Act (SGMA)