Pared-Down Water Plan to Be Submitted in 1987

Los Angeles Times | June 17th, 1985

Summary

SACRAMENTO — Gov. George Deukmejian’s Administration is preparing to submit a new water package to the Legislature in 1987, a stripped-down version of the plan that f

Productive wetlands restored for carbon sequestration quickly become net CO2 sinks with site-level factors driving uptake variability

PLOS | March 25th, 2021

Summary

Inundated wetlands can potentially sequester substantial amounts of soil carbon (C) over the long-term because of slow decomposition and high primary productivity, partic

Promoting atmospheric-river and snowmelt fueled biogeomorphic processes by restoring river-floodplain connectivity in California’s Central Valley

Springer | April 30th, 2015

Summary

Potential biogeomorphic benefits from intentional levee breaks and weir overflow on the managed floodplain-river system of California’s Sacramento and San Joaquin River

Prospect Island Tidal Habitat Restoration Project: Admin Final Restoration Plan

California Department of Water Resources (DWR) | June 12th, 2014

Summary

This Prospect Island Tidal Habitat Restoration Project (Project) Draft Restoration Plan (Plan) describes the proposed actions needed to restore up to 1,600 acre (ac) of

Protocol for Closure of Delta Waterways

Office of Emergency Services | November 21st, 1997

Summary

This protocol describes the process for placing restrictions on vessel traffic on the San Joaquin/Sacramento Delta waterways during periods of high water levels and flood

Report Card for California's Infrastructure 2019

American Society of Civil Engineers (ASCE) | May 9th, 2019

Summary

Risks and Options to Reduce Risks to Fishery and Water Supply Uses of the Sacramento/San Joaquin Delta

California Department of Water Resources (DWR) | January 1st, 2008

Summary

Assembly Bill (AB) 1200 (Laird, Chapter 573, Statutes of 2005) highlighted the complex Delta water issues, and directed the Department of Water Resources (DWR) and the De

Sacramento County | Making Room for Recharge: Cosumnes River Levee Removal and Floodplain Restoration

Nature Conservancy | June 12th, 2014

Summary

Reconnecting rivers to floodplains can facilitate groundwater recharge. A recent project along the Cosumnes River is one of the first to intentionally demonstra

Filter Results

Type

Topic

Keywords

Publisher

Basin

Hydrological Region